Air Cooled Chillers & Dry Air Cooler Installation

Wednesbury

A client in Wednesbury required a full design, supply and installation of two new 200kw air cooled chillers, complete with scroll compressors and a 515 litre buffer tank alongside a 200kw dry air cooler. Design parameters were set at 10°c flow, 15° return and 35°c ambient with water/glycol at 25%. With the system designed, the installation had to be completed on time, on budget and allowed plant to open within programme. Complete with BMS integration and remote monitoring, the client can now monitor their complete system. The dry cooler provides free cooling when the external ambient is below the chilled water design temperatures, thus eliminating completely compressor operation during long periods – i.e winter.

Gas Fired Heating Installation

Wollaston

A project installing 6 gas fired heaters alongside 4 destrat fans in order to achieve a working temperature inside the warehouse. Using powered access equipment on site we installed all steel gas pipework, all colour coded to the clients specifications.

Downflow Benches Installation

Broadstairs

The installation of 6 new downflow benches for the extraction needed on site. The client had a requirement for a solution which met health and safety for operatives working at each station. The ink used in their process releases fumes and it is essential that these are taken away from the operatives and extracted. Downflow benches were the best solution for this type of project due to the nature of work on site and how each station was set up. We were able to provide a cost effective and permanent solution suitable for the project and budget.

Server Room Air Conditioning Installation

Willenhall

A Mitsubishi 3.5kw professional inverter system installed in Willenhall for a new server room. They required an effective solution to maintain room cooling and with minimum energy costs. After a site survey to understand the room size, calculate the heat load from the server towers and equipment location, we were quickly able to send over a quotation to suit and book the installation in. A few days later and the job was complete.

Air Conditioning Cassettes Installation

Hinckley

A well established business in Hinckley required 4 cassette units to be installed ready for the newly opening shop and warehouse. After visiting site to understand their cooling requirements we were able to submit a suitable quotation ready to start the project. All 4 cassette systems were installed at high level with cable tray containing all pipework and cables. The ceiling was left exposed so attention to detail was paramount to ensure all services and ancillaries looked neat and tidy once installed. Only one controller was incorporated into the setup as all systems were striving to achieve a suitable temperature in the open space. Whether the client uses the systems to heat or cool, we were able to offer the best solution and equipment to enable reliability and comfort all year round.

Gas Fired Suspended Heater Installation

West Bromwich

A steel manufacturers in West Bromwich had a fault with an old 55kw gas fired heater no longer functioning within the factory. Due to the size of the factory we recommended a larger 70kw be installed to help keep efficiency in mind whilst heating the entire space required. Upon an agreed order our engineers attended site to decommission and remove the existing 55kw heater and install a new Powrmatic 70kw. All new flue and fixings were incorporated into the installation, a new frame to complete the job and a happy client after just a few days of us starting. With a 12-month guarantee to see them through, we were happy to complete another project for a local business.

Extract Ventilation Install

Broadstairs

Due to the successful installation at Broadstairs we were invited back to help relocate an existing ventilation/dust extraction system. This relocation allowed us to eliminate the requirement for roof access during regular maintenance visits.